Strataline
Call (416) 471-5999
Finished Bolton interior with dark engineered maple flooring around a refinished staircase, new square posts and satin-black metal balusters.

PROJECT STORY · ENGINEERED MAPLE FLOORING & STAIR REFINISHING · BOLTON

Engineered Maple Flooring & Stair Refinishing in Bolton

Dark engineered maple replaced the old parquet in this Bolton home. We refinished the staircase at the same time, fitted new square posts and changed the wood spindles to satin-black metal. The thicker flooring also meant raising the stair nosing so the new floor and staircase could meet properly.

Bolton, OntarioEngineered maple flooring installation and staircase refinishing
Location
Bolton, Ontario
Flooring
Old parquet replaced with dark engineered maple
Floor thickness
3/8-inch parquet replaced with 3/4-inch flooring
Staircase
Existing staircase refinished; nosing raised for the new floor
Railing
New square posts and satin-black plain and decorative balusters
Demolition
Dust-free removal using Festool dust extractors
REPLACING YOUR FLOORS AND UPDATING THE STAIRS?

Out with the old parquet

The small-block parquet gave the floor a busy pattern that continued around the staircase. Replacing it with dark engineered maple changed the appearance of the surrounding space as well as the floor itself.

We removed the parquet using our dust-free demolition method, with Festool dust extractors working alongside the demolition equipment. Dust control was part of removing the old floor, not something saved for the final cleanup.

With the parquet out, we installed the new maple flooring and dealt with the change in height where it reached the stairs.

Dark engineered maple replaces the parquet across the landing.

The thicker floor changed the stair edge

The old parquet was 3/8 inch thick. The new engineered maple was 3/4 inch—twice the thickness.

That difference mattered at the stair nosing, the finished edge where the floor meets the stair opening. Leaving it at its original height would not have suited the new flooring.

We raised the nosing to accommodate the thicker floor. It was a small-looking detail, but an important part of finishing the two jobs together. The floor could not simply be changed without considering the staircase beside it.

Before view of the Bolton room with small-block parquet flooring, the original wood railing and the existing staircase.
Before
Matching after view with dark engineered maple flooring, the refinished staircase, new square posts and satin-black metal balusters.
After
Dark engineered maple replaces the parquet around the staircase.
Bolton landing before renovation with parquet flooring beside the stair opening and the original wood railing.
Before
Matching Bolton landing after dark engineered maple flooring was installed beside the stair opening and the railing was updated.
After

The flooring beside the stair opening changed from parquet to engineered maple.

Refinishing the staircase

We refinished the existing staircase rather than replacing it. Alongside the darker floor, the renewed stair finish changed the view from both the main floor and the landing.

The railing received its own update. New square posts replaced the old posts, and the wooden spindles made way for satin-black metal.

That kept the work focused: new flooring where the parquet had been, refinishing for the existing staircase, and new components where the railing design was changing.

Before view of the Bolton staircase with its original wood finish, wood spindles and parquet flooring beside the lower steps.
Before
Matching after view of the refinished Bolton staircase with dark treads, white risers, a new square post and satin-black metal balusters.
After
The existing staircase refinished, with new square posts and satin-black metal spindles.

Plain spindles with a decorative accent

The new balusters combine plain profiles with a double-knuckle, double-leaf design.

The plain spindles give the decorative pieces room to stand out without making every position equally busy. All share the same satin-black finish, while the square posts keep the ends of the railing simple.

It is a different look from the original all-wood railing, carried through the stair flight and landing.

Bolton upper balustrade before renovation with turned wood spindles, a wood post and parquet flooring.
Before
Matching Bolton upper balustrade with a new square post and satin-black plain and double-knuckle, double-leaf metal balusters.
After

The new balustrade combines plain spindles with double-knuckle, double-leaf details.

A finished connection between floor and stairs

The old parquet and wooden spindles are gone, but the staircase itself remains.

Dark engineered maple, refinished stair surfaces and the new railing give the space a different character. Raising the nosing completes the less obvious part of the transformation: making the new floor work with the existing stairs, not just look different beside them.

The new flooring and refinished staircase seen together from the adjoining space.

Planning answers

What homeowners can learn from this project

What flooring replaced the parquet?

We installed dark engineered maple. The new flooring was 3/4 inch thick, compared with the 3/8-inch parquet that was removed.

Why did the stair nosing need to be raised?

The replacement flooring was thicker than the old parquet. We raised the nosing to accommodate the new floor height and finish the connection at the stair opening.

Was the staircase replaced or capped?

Neither. The existing staircase was refinished, while the posts and spindles were replaced. The nosing was also raised as part of coordinating the staircase with the new flooring.

What balusters were used?

The new railing combines plain metal balusters with double-knuckle, double-leaf decorative balusters, all in satin black. New square posts completed the update.

How was dust controlled during the flooring demolition?

We used Festool dust extractors alongside the demolition equipment as part of our dust-free removal method. Controlling dust was built into taking out the parquet, rather than relying only on cleaning after demolition.

CONTINUE EXPLORING

Related projects, guidance and services.

Replacing your floors and updating the stairs?

Send us photographs of the existing flooring, staircase and landing. We’ll review the flooring change, stair finish and railing together, including the transition where the new floor meets the stairs.

Call or Text (416) 471-5999

Project inquiry

Tell us about your project

A few details will help us understand the scope before we contact you.

Step 1 of 2 — Project

Get a reply within 12 hours.

Prefer to talk? Call (416) 471-5999 Text (416) 471-5999

Step 2 of 2 — Contact

Your contact details

Your information is used only to review and respond to your project inquiry.