Smash-and-grab and forced entry
Explore glazing or retrofit barriers intended to resist or delay physical entry. Ask what the proposed product has been tested to do and how it will be retained in the opening.
Explore Anti-Smash GlazingCOMMERCIAL SECURITY · TORONTO & THE GTA
Strengthen the storefront without losing its welcome. Discuss security glazing, entrance upgrades and retrofit options around the way your business operates.
Homes & businesses · Toronto & the GTA
Planned around your property
A storefront is more than its largest pane. Display windows, entrance doors, sidelights, frames and surrounding construction all affect the proposed upgrade.
Discuss glazing work alongside associated opening preparation and finishing. Start with your priorities, the existing frontage and the disruption your business can accommodate.
Explore glazing or retrofit barriers intended to resist or delay physical entry. Ask what the proposed product has been tested to do and how it will be retained in the opening.
Explore Anti-Smash GlazingA ballistic requirement calls for an appropriately documented bullet-resistant system. Do not assume a forced-entry product also provides bullet resistance.
Explore Bullet-Resistant WindowsTell us that both ballistic and forced-entry performance are needed. The proposed system must have supporting evidence for each requirement.
Discuss both requirements01 / The complete opening
Some systems use additional glazing and purpose-designed framing around existing windows or doors. Feasibility depends on the chosen system, existing condition and available fixing locations.
Complete replacement may be appropriate where the current frame is unsuitable or the system requires a different assembly. The scope should include removal, installation and agreed finishing.
Door movement, handles, locks, closers, thresholds and adjacent glazing need attention when included in the project. Choices should preserve required access and exit functions.
02 / The complete opening
Discuss customer access, deliveries, display areas and operating hours before installation is scheduled.
Where feasible, work can be planned in stages around business needs. Timing depends on the agreed scope, product availability and conditions.
Potential applications include retail premises, jewellery stores, offices, reception areas, pharmacies and other commercial properties.
Strataline · Established 2015
Based in Vaughan, Strataline coordinates installation and the agreed surrounding repairs and finishing. Start with a project review and a custom quotation.
Company experience is separate from the selected security system’s documented performance.
A quote for your project
Look for a clear description of the glazing and framing, supporting performance documentation where a security rating is claimed, installation, access requirements and finishing. Exclusions should be explicit.
Cost depends on opening sizes and quantities, system specification, existing frames, door work, access and installation scheduling.
A site-specific proposal is a more useful comparison than a glazing-only square-foot figure.
Request a Storefront QuoteFAQ
No. Security glazing is a broad category. Forced-entry resistance and bullet resistance are separate requirements. A ballistic claim needs supporting documentation for the proposed system.
A targeted upgrade may be possible. The scope should identify which openings change and which remain unchanged. A partial installation must not be represented as protection for the entire frontage.
Not in every case. Some systems support retrofit applications; others require new framing. Suitability depends on the selected system and existing opening.
Discuss operating hours and access constraints when you enquire. The schedule is confirmed with the scope and product availability. After-hours work or uninterrupted trading is not assumed.
Request these in the initial scope. The proposal can identify associated entrance work, opening preparation and agreed making-good, subject to the selected system’s requirements.
Send the city, a general photo, approximate dimensions, opening count and the upgrade’s objective. Include an existing specification where available. Detailed measurement and technical review follow as needed.