The same colours. A freshly finished condo.
The owners returned from vacation to the rooms they knew, freshly painted and cleaned. Ceilings, walls, doors, baseboards and trim were included, while most existing colours stayed. The furnished condo was protected, repairs were made and the surfaces were sanded with source extraction.
The entrance door was restored, loose aluminum kickboards were replaced with wood, and bathroom edges were recaulked. The recorded project duration was 4.5 days; that was the schedule for this scope and access arrangement, not a turnaround promise for another home.