Ceilings, crown, columns and fireplace finishing
Whole-home painting coordinated with ceiling preparation, intricate crown moulding and a fireplace renovation in Burlington.
See the Burlington renovation →
Interior renovation contractor · Toronto, Vaughan & the GTA
Ceilings, walls, flooring, trim, doors, cabinetry, kitchens, bathrooms and stairs all meet somewhere. Strataline coordinates the sequence, protects the home and keeps one owner involved from the written scope through final walkthrough.
Project fit
Strataline is best suited to interior renovations where several rooms, surfaces or finish systems need one written scope and a deliberate order of work.
Whole-home painting coordinated with ceiling preparation, intricate crown moulding and a fireplace renovation in Burlington.
See the Burlington renovation →
Popcorn removal, smooth ceiling finishing, hardwood installation, stair capping, railings and painting were sequenced across the same interior.
See the ceiling, hardwood and staircase project →
Smooth ceilings, engineered and luxury-vinyl flooring, new interior doors, trim and paint were completed before the owners moved in.
See the Newmarket pre-move-in renovation →
Protected popcorn removal and smooth ceiling finishing were divided into two phases while the furnished condominium remained occupied.
See the occupied Toronto condominium project →
A wider foyer layout, rebuilt lower steps and custom railing brought the dining room and sitting room together.
See the King City connected-interior project →
New flooring, a raised stair nosing and satin-black balusters brought this Bolton floor-and-staircase renovation together.
See the Bolton flooring-and-stair project →Connected renovation case study
Ceilings, hardwood and a curved staircase · Location withheld
This project combined popcorn-ceiling removal and correction, hardwood installation, stair capping, new railings and painting. The work was sequenced so every completed surface met the next one cleanly.
Smooth ceilings · Hardwood flooring · Curved staircase · New railings · Painting
Read the complete project story →Before and after
This Newmarket renovation reorganized a builder-grade galley around useful storage, working surface, appliance fit, lighting and a clearer connection to the dining room.
View the complete Newmarket kitchen project →Interior scope
The best result comes from resolving where materials, elevations and finished edges meet—not treating each service as a separate menu item.
Disruptive texture removal and surface correction need to finish before vulnerable floors, trim and final paint are exposed.
A condo refresh without replacing the rooms.
Painting, a restored entrance door, renewed bathroom caulking and matching kickboards brought this College Street condo back to a fresh finish.
See the complete College Street condo project →Floor heights, doorway clearances, nosing, baseboards and casing profiles are resolved where rooms meet.
Larger windows can be part of the renovation.
In Woodbridge, we changed six small arched windows into three larger rectangular windows, including the brickwork and exterior finishing around them.
See the window-enlargement project →Cabinetry, counters, tile, fixtures, lighting and adjoining finishes must land against finished walls and floors.
Treads, risers, posts, railings, floor nosing and surrounding paint form one visible assembly.
Dust-controlled renovation
See the equipment behind our dust-controlled work →
Containment, source extraction and protected access routes help keep renovation dust out of adjoining rooms.
Maxim Sologub reviews the project, develops the written scope and remains involved in scheduling, trade coordination and quality control.
Maxim Sologub Owner, Strataline Inc.Share the rooms, priorities, photographs, address and preferred timing.
Existing conditions, measurements, access and connected scope are reviewed in the home.
The proposal identifies work, exclusions, responsibilities, sequencing and payment milestones.
Work moves from protection and disruptive preparation toward installations and final finishes.
Completed work and finish details are reviewed together before project closeout.
Client reviews
Feedback from homeowners and project partners across the GTA, collected from Google and Facebook.
1–3 of 15
Read full reviewI love my new stairs! I am so happy I chose Strataline to renovate the staircase in my house.
Read full review See Ilene and Mario’s door-finishing projectTheir attention to the smallest of details speaks volumes of the pride they take in their work.
Read full reviewMax and his team at Strataline have done multiple home improvement projects for us, including stair refinishing, popcorn ceiling removal, new flooring and interior painting. From the start their team was professional and punctual.
Read full reviewThe Popcorn removal was excellent and a very clean process. They also transformed our stairs from boring oak to a much more modern look. They handled repainting of the whole house and replacement of old tile floors with a beautiful new one.
Read full review See the Burlington ceiling and staircase projectIt looked so good we ended up having our main hallway, front foyer, & sunroom ceilings re-done as well.
Read full reviewMax of Strataline Inc. did an exceptional job creating 1) a custom inside railing for a winding grand staircase and 2) installing outdoor railings.
Read full reviewWe had great experience working with Max. He was very attentive to all our concerns and requests, easy communication and quality of workmanship is outstanding!
Read full reviewAmazing team, they painted my entire home , extremely attentive to the details, they cover and mask everything to avoid dust and mess ( I am super picky and OCD and hard to please but Galina and Maxim nailed it).
Read full reviewExcellent services: customer service, expertise, pricing policy. Impressive scheduling and delivering services by expected date of completion.
Read full reviewExcellent team , top notch quality! Very happy with their work!
Read full review See the condo behind Greg’s reviewThe quality of the painting was excellent, but what really stood out was how clean they kept everything.
Read full reviewWe had an excellent experience working with Maxim and Strataline Inc. Installing and perfectly matching a custom stain for our oak treads was no small task, and the addition of the square posts made it an even greater technical challenge—but everything was executed flawlessly.
Read full reviewWOW! Just WOW! Max removed all the popcorn from our 1800 sq ft town home, repainted from top to bottom plus did some carpentry repairs on our floors…and the final result is spectacular!
Read full reviewMaxim at Strataline did a very professional job in removing our hallway popcorn/stucco ceiling. The end result was a completely smooth surface and not only that, they totally sealed off the area so absolutely not dust penetrated other areas of the house.
Read full reviewMy husband and I are unbelievably happy with the work that Max and his team did on our ceilings in the house. The professionalism of this team is incredible.
Media appearances
Watch Strataline demonstrate dust-controlled ceiling removal on Cityline.
Read the dust-controlled ceiling process described in the feature →Cityline · CityTV
Planning FAQ
We renovate interiors, including ceilings, stairs and railings, painting, flooring, wallpaper, kitchens, bathrooms, doors and windows. Work can be one carefully defined repair or a coordinated renovation across several rooms. We identify the work our crew performs and the licensed or specialized partners needed for the project, with responsibilities and exclusions recorded in the written scope.
A useful quote identifies the surfaces and rooms included, preparation, repair assumptions, materials or allowances, finishing, protection, cleanup and exclusions. It also sets out responsibilities, sequencing and payment milestones. Compare those details before comparing totals: a removal-only price and a repaired, primed and painted result describe different amounts of work.
We plan disruptive work and concealed services before vulnerable finishes. Ceiling correction, wall preparation, cabinetry, flooring, trim and final paint need a coordinated order, with licensed trades returning at the appropriate stages. Product dimensions and finish decisions are settled early so a later installer does not have to cut into or rebuild completed work.
Often, with a practical plan for usable rooms, protected circulation and temporary restrictions. The answer depends on the scope, drying stages and whether essential stairs, the kitchen or the only bathroom must close. We discuss those interruptions before scheduling. A contained work zone still needs to remain clear of household traffic while work is underway.
For applicable work such as ceiling removal, stair sanding, wall correction and painting preparation, our dust-free process combines containment, floor and furniture protection, HEPA extraction, Festool and Mirka sanding equipment, controlled sanding, air management, cleanup and inspection. The system captures sanding dust and protects occupied areas. Demolition and brick cutting still generate dust at the work point and need operation-specific containment.
The proposed work is reviewed with the municipality and appropriate professionals where required. Finish replacement and changes to structure, openings or services are different scopes; one municipality’s answer should not be assumed to apply everywhere. We define drawings, submission responsibilities and approval requirements before construction. Permit-required work does not begin until approval is issued.
A typical larger project uses 30% when booked or products are ordered, 30% when products arrive at the client’s property, and 40% following installation and completion. These terms are flexible, not mandatory for every project. The individual written agreement controls and identifies the milestones so payment follows the agreed purchasing and construction plan. These typical milestones do not retrospectively replace the payment terms in a signed project agreement.
We warrant our labour and installation to the original client for as long as that client owns the property, subject to the applicable manufacturer-warranty period for supplied products. Where no meaningful manufacturer warranty exists, workmanship coverage continues through the original client’s ownership. If a problem is caused by our workmanship, we return and correct it. Coverage ends when the property is sold or another contractor modifies or repairs the covered work.
The warranty covers genuine labour or installation defects. It excludes ordinary dirt, normal wear, accidental damage, misuse, abuse, inadequate maintenance, unrelated water intrusion, third-party damage, structural movement and client-supplied product defects.
Send the property city, the work you want done, preferred timing, approximate dimensions and clear wide and close photographs. Include connected work, visible damage, access restrictions and whether anyone will be living in the home. This lets us discuss a useful starting scope; final measurements and uncertain conditions may still require a site visit.
An allowance identifies the amount included for a product or selection that has not been finalized. Confirm what quantity, installation work and related accessories it assumes. Once the selection is known, differences need to be recorded before ordering. A more expensive fixture can also need different backing, fittings or labour, beyond its purchase price alone.
We do not apply one universal project minimum. Small work may be accepted when it matters to the client, is technically demanding, supports accessibility, involves an existing client or is logistically practical. A defect only a few square inches in size can require protection, filling, sanding, priming, colour matching and repainting a larger plane so it does not look patched.
Written quotes are normally valid for 30 days unless the quote states otherwise. Public website price ranges are before HST. Supplier pricing and availability can change after a quote expires, so an older estimate should be reconfirmed before products are ordered or a date is booked. The current written agreement sets the amount and terms for your project.
A requested change needs a clear description of what is being added, removed or substituted, together with the price and scheduling effect. We review it before the changed work proceeds. Even a small visible change can affect ordered materials or another trade, so decisions are recorded against the written scope rather than left to an informal assumption.
Ask about renovation approval, contractor documents, work hours, elevator and loading reservations, common-area protection, disposal and any water shutoff procedure. Flooring or exterior-opening work can require additional product approval. Share those requirements before ordering or booking construction; building permission and municipal or trade approvals are separate parts of planning.
Often, yes. We can review product suitability and coordinate ordering with the installation, and we can often obtain better trade pricing. That is not true for every product, so compare the actual supplied scope and price. Supplying the product also lets us coordinate a potential manufacturer claim during the applicable warranty period, including our stated removal and reinstallation responsibility.
We may install client-purchased doors, windows, flooring, tile, plumbing fixtures, lighting, hardware and similar products. We remain responsible for the workmanship of our own installation. You remain responsible for the product warranty, defects, missing components and compatibility.
Replacement products and additional removal or reinstallation caused by a client-supplied product failure are chargeable. Such products can also affect price and schedule, so send the complete product information before buying or booking installation.
For a potential manufacturing defect within the applicable warranty period, we inspect the issue, document the condition, gather photographs and evidence, communicate with the supplier or manufacturer, and coordinate the claim for you. Strataline covers removal and reinstallation labour associated with a valid supplied-product warranty issue.
The replacement product is governed by the manufacturer’s written warranty; approval is not guaranteed. If a claim is denied because we installed the product incorrectly, we correct our work.
We can coordinate an architectural firm with access to architects and engineers. The partner can prepare drawings and documentation and submit the application on the homeowner’s behalf; the homeowner is normally named as the applicant. Architectural, engineering and municipal permit fees are separate, and Strataline’s coordination fee is quoted separately. Responsibilities and costs are defined before work begins.
The appropriate licensed trade partners complete regulated electrical, plumbing, HVAC, gas and similar work, coordinated by Strataline. Our ordinary renovation crew does not personally perform every specialty. The written scope identifies the required trades and responsibilities. For electrical work, the contractor’s ECRA/ESA licence can be checked through the Electrical Safety Authority.
Yes, where suitable, we can coordinate qualified specialists for work such as emergency water extraction, fire-loss mitigation, mold remediation, asbestos abatement, roofing, foundation repair, major construction, septic systems or HVAC service. That is a coordination role, not a claim that our finishing crew performs every specialty. The required specialist, responsibilities and separate scope are identified for the project.
Emergency mitigation and the later rebuilding scope need to be distinguished. Strataline may coordinate qualified water-extraction, fire-loss or other restoration specialists, then define the renovation work once the affected conditions have been assessed. Share the insurer or adjuster’s requirements and the responsible contacts before agreeing to repairs. The written scope should identify responsibilities and payment arrangements; coordination does not promise that an insurer will approve or pay for every proposed item.
Yes. An accredited outside company attends the property, collects the sample and sends it for laboratory analysis. Testing is billed through Strataline. We coordinate the testing before potentially affected material is disturbed; our employees do not perform laboratory asbestos analysis. A photograph or the appearance of a ceiling cannot establish whether the material contains asbestos.
Approximately 24-hour turnaround is typical. Same-day or expedited results may be arranged only when the provider receives the sample before its cutoff and confirms availability. We confirm that timing with the outside provider rather than promising a guaranteed result time. Testing and any follow-up specialist work must be allowed for in the renovation sequence.
A qualified abatement contractor carries out asbestos abatement, and Strataline coordinates that contractor where required. Ordinary scraping, sanding or renovation does not simply continue through the affected material. The specialist’s scope and the conditions for handing the area back to the renovation crew are established before finishing resumes; testing is separate from the abatement work itself.
A clear room gives the best working access, but the plan depends on what can reasonably be moved. We identify items to relocate, protect remaining furniture and floors, and keep a usable route outside the work zone. Fragile possessions need particular attention. Protection and handling are included in the scope according to the actual room, not assumed from its floor area.
Temporary barriers and protected circulation routes separate active work from adjoining rooms, while connected extraction captures dust where sanding occurs. An open stairwell, double-height space or kitchen connection changes how containment can be arranged. The work sequence and air management are planned with those openings in mind, rather than relying on floor covering alone.
Those operations create dust at the point of work. We plan containment, suitable extraction, protected routes, material handling and cleanup to prevent it spreading through occupied parts of the home. The setup differs from finish sanding and depends on the opening, access and material. Dust-free sanding equipment does not make every demolition or exterior operation literally dustless.
Decide where food preparation, drinking water, small appliances and basic storage can function while the kitchen is unavailable. The plan must account for shutoffs, protected circulation and areas that cannot be used during construction. A temporary setup should sit outside the active work zone. We discuss the expected interruptions before work so staying in the home is a practical decision.
The household needs a workable alternative before construction removes access to its only bathroom. Protection and daily cleanup do not make an unfinished shower or disconnected toilet usable. We discuss the sequence and expected interruptions with the scope. If another bathroom remains available, protected access and planned shutoffs can make occupancy more practical.
Finished height and existing tone affect every junction. We review landings, nosings, door clearances, thresholds and perimeter trim with the floor plan. The written scope states which adjoining items remain, are adjusted or are replaced. Resolving those details before installation avoids treating each doorway as an isolated patch after the main floor is already laid.
Timing depends on repairs, component fitting, sample approval, coatings and the railing scope. We plan periods when the stairs must be clear and explain access restrictions before work begins. Light use, normal traffic and full finish cure are different milestones. A household that relies on the only staircase needs a workable access plan around those stages.
No. The scheduling deposit reserves time for your project and is non-refundable, whether or not materials or products have been ordered. It is credited toward the agreed project price. If your timing changes, contact us early so we can review availability and confirm any agreed changes in writing. This does not limit cancellation or refund rights provided by applicable law.
The non-refundable scheduling deposit reserves the project date and is credited toward the agreed project price. Once we receive it, we do not move that date to make room for another project. The agreed scope, access and material plan still need to be coordinated around that booking. If the client needs a different date, we review the earliest mutually available opening around projects that are already confirmed.
You may request a different project date. The replacement date must fit around already confirmed work, and we offer the earliest mutually available date. Tell us as soon as the constraint becomes known so deliveries and access can be coordinated. Scheduling deposits remain non-refundable whether or not products have been ordered. We confirm any agreed scheduling changes in writing. Product-order payments are separate, and custom or special-order products already ordered remain subject to their ordering commitment. Applicable statutory cancellation or refund rights are preserved.
Yes. We accept small and large accessibility projects, including short handrails, grab bars, extra railings, safety modifications, door and access changes, and bathroom adaptations. The importance of the change to the client matters more than its visible size. We review the recommended location, suitable support and practical construction conditions before defining the work.
Yes. We work directly with occupational therapists, review documented recommendations and advise on practical construction feasibility. If framing, space, access or another constraint affects the recommendation, we coordinate with the OT to refine the solution. The aim is to build the agreed alteration around the person’s documented needs without substituting construction judgement for clinical advice.
Urgent discharge-related work receives scheduling priority and is arranged as quickly as the scope, materials and access allow. We accept hospital, insurance and accessibility-program referrals. Send the documented recommendation and the required timing at the outset. Priority does not mean every job can begin immediately; product availability, safe installation and property access still need to be resolved.
Yes, we accept suitable cottage-country and remote-Ontario projects, including water-access properties and island cottages. We have experience with tool transport by boat, barge delivery, window and door delivery, remote material handling, accommodation and freight planning. The access plan forms part of the quote because a cottage project involves more than the work inside the building.
We review the property access and the size, quantity and handling needs of the materials and equipment before arranging transport. Tools may travel by boat, while larger doors, windows or deliveries can require a barge. Delivery, unloading and the movement to the building must be coordinated with the work sequence so the needed materials arrive in a usable order.
Travel, accommodation, boat transport, barge rental and special freight are quoted according to the project. Tell us about the access arrangements early, including how products and tools reach the building. A remote job can require a different delivery and working schedule from a local house, and those logistics should be defined alongside the renovation scope.
Inspection lighting helps expose surface defects on ceilings, walls, paint and wood that can be missed in general room light. We also take a client’s lighting-dependent concern seriously. In one case, we returned to refinish a piece with a subtle reflected sanding pattern, inspected it from multiple light angles and completed the correction without charge. Natural wood still varies with grain and lighting.
The work zone and protected access route are cleaned, the finishes are inspected, and any outstanding scope items are reviewed before handover. Protection removal is sequenced so debris does not get dragged through finished rooms. Daily cleanup and final completion serve different purposes: a tidy intermediate work area can still need curing time or another finishing stage.
Let us know what changed, when it appeared and where it is, with wide and close photographs if possible. Do not assume that a small or lighting-dependent flaw is unimportant. After more than 15 years in business, workmanship callbacks are rare, but we still investigate reported issues and return to correct genuine defects caused by our work.
Service area
We serve the communities below. Project availability depends on scope, access and scheduling.