Strataline
Call (416) 471-5999
Dark entry door with decorative geometric glass and one sidelight beneath a covered porch.

Exterior door sales & installation · Vaughan, Toronto & the GTA

Exterior door replacement in Vaughan & Toronto

An entrance that suits your home, finished inside and out.

Choose your door, glass and finish. We measure your entrance, supply and install the selected system, then complete the sealing and trim in your quote.

Call (416) 471-5999 Text us

Owner-led installation · Measured before ordering · Agreed finishing in one quote

Finished glazed door and interior trim in Strataline’s Aurora bedroom conversion.

A Strataline project · Aurora

A new way out to the pool deck.

We converted a bedroom window into a glazed exterior door, with the opening and interior finishing handled together.

See the before & after →

Workmanship warranty · Supplied-product support

Door materials

Steel or fibreglass: compare the complete door system

Compare both options with the same entrance layout, glass, finish, hardware and installation scope. Review the supplied product’s care instructions and warranty alongside the price.

Appearance and care at a glance
Your prioritySteelFibreglass
AppearanceA smooth painted finish.Smooth or wood-grain surfaces, depending on the system.
CareKeep the paint intact and address scratches or rust promptly.Follow the selected finish’s cleaning and recoating instructions.

For either material, choose a finish suited to the entrance’s sun and weather exposure and follow the selected product’s care instructions.

DOOR GLASS

Find your glass pattern

Compare a simple glass layout, a divided pattern or decorative glazing. We’ll help you balance daylight and privacy, then review the available glass for your selected door system.

Full geometric glass pattern in a light-brown wood-look door.

Decorative geometric glass

A detailed geometric pattern that makes the glass a feature of the entrance. Review a sample to compare the view through it.

Browse decorative-glass designs
Wood-look door with a full glass pattern of frosted-looking and textured sections.

Textured and frosted-look glass

A contemporary arrangement of large glass sections with horizontal and vertical divisions.

Browse all door designs
Four frosted-looking glass panels separated by horizontal white dividers.

Four-panel glass

Four broad glass panels separated by horizontal dividers for a clean, contemporary pattern.

Browse modern designs

Configuration

Find the right entrance layout

A single door keeps the opening simple. Sidelights add glass beside it; a transom adds light above. The opening dimensions determine the layouts to consider.

Single door

A focused entrance within the existing rough opening.

Single door + sidelite

Added glass or visual width on one side.

Single door + two sidelites

A balanced entrance with glass on both sides.

Double doors

A broad opening planned around swing, hardware and symmetry.

Door + transom

Daylight above the slab where opening height permits.

Door + sidelites + transom

A complete glazed surround requiring exact field dimensions.

Cost & scope

What affects your door replacement cost?

The door system and the work around the opening determine the installed price.

Same-opening replacement

The selected door system, removal, installation, sealing and agreed trim form the starting scope. Frame or wall repairs are identified separately.

Glass and sidelights

The size and arrangement of glass, sidelights and a transom affect the system and finishing required. Compare complete entrances with the same hardware and scope.

A new or enlarged opening

Opening construction adds work beyond replacement, including the wall, support and surrounding finishes. Any drawings, approvals and landing changes are assessed with the opening.

Your written quote identifies the door, glass, hardware, removal and disposal, installation, sealing and agreed trim or painting, with delivery and HST treatment stated.

Request a door quote

Installation quality

Installed properly. Finished neatly.

A smooth-closing door starts with a sound opening, an adjusted frame and a sealed perimeter. We finish the trim included in your quote.

Aurora window-to-door conversion during construction, with the old window removed and the new glazed door beside the opening.
Aurora project · Preparing the new opening.
Finished Aurora glazed exterior door showing the white perimeter trim, sill and surrounding brickwork.
The completed door, exterior trim and threshold.
1

A sound, accurate fit

We check the opening and support the frame so the door operates smoothly.

2

The perimeter matters

Insulation, sealing and water-management details are addressed as part of the installation.

3

A complete finish

Interior casing, exterior trim and any agreed finishing are planned before installation, then checked with you at completion.

What we review in your installation quote
  1. Site measure and opening review
  2. Product and configuration confirmation
  3. Swing, handing and hardware coordination
  4. Removal of the existing door system
  5. Opening preparation and documented repairs
  6. Setting, fastening and operational adjustment
  7. Perimeter insulation and air sealing
  8. Exterior flashing and sealant details where applicable
  9. Threshold and sill relationship
  10. Interior jamb extensions, casing and trim
  11. Exterior trim or capping included in the quote
  12. Protection, cleanup and final walkthrough

If removal reveals damage outside the agreed scope, we document it and discuss the repair and price before additional work proceeds.

Finish, hardware & comfort

Choose the finishing details

See the finish sample

Start with a painted colour or wood-grain appearance. Compare a physical sample with your brick, siding and interior trim before selecting the finish.

Choose compatible hardware

Consider how the handle feels and how you want to lock the door. If you have a smart lock in mind, share its model so we can check it against the door preparation and locking system.

Review security & winter comfort

Review the lock, frame and strike together. The weather seals, sill and glass are also part of the system, so we explain the selected product’s care and performance information with your quote.

Patio and sliding doors

Sliding or hinged patio doors?

Choose how the door opens, then compare the usable opening, screen and sill with your room and exterior landing.

Two-panel sliding patio door operating diagramThe right panel slides left alongside a fixed panel without swinging into the room. This is an operating illustration.Fixed panelSliding panelSliding operation diagram

Sliding patio door

A panel moves alongside the fixed panel, leaving the floor clear of a door swing. Compare the clear opening width, screen track and sill height.

White glazed patio entrance viewed from a deck, with one hinged panel open inward.

Hinged patio entrance

The pictured panel swings inward. Allow clear floor space for the swing and review the usable opening.

Interior view of the original Aurora bedroom window before conversion to a patio door.
Before · Existing bedroom window
Finished full-height glazed patio door in the Aurora bedroom.
After · Finished glazed exterior door

STRATALINE PROJECT · AURORA

From bedroom window to a direct route to the pool deck.

Strataline converted the existing bedroom window into a full-height glazed exterior door, coordinating the new opening, installation and interior finishing to create direct access to the pool deck.

View the complete Aurora project

Strataline workmanship reviews

Care in the details

Homeowner feedback on door finishing, craftsmanship and communication across our renovation work.

Google review

He painted several other areas as well and sanded and reapplied urethane on all our new doors. He and Galina are superb craftsmen. Their attention to the smallest of details speaks volumes of the pride they take in their work.

Read full review

Ilene Bottos

Maple

Google review

We had great experience working with Max. He was very attentive to all our concerns and requests, easy communication and quality of workmanship is outstanding!

Read full review

Jet Pro

Google review

Excellent services: customer service, expertise, pricing policy. Impressive scheduling and delivering services by expected date of completion.

Read full review

Mykhailo Tvorysh

Read all Strataline reviews

FROM DOOR SELECTION TO INSTALLATION

From choosing your door to installation day

Manufacturing and delivery time are separate from work at your home. We agree both schedules before the project begins.

  1. 01

    Share your entrance

    Tell us your city and the entrance you want to replace. Photos from inside and outside are helpful but optional.

  2. 02

    Review suitable designs

    Compare your saved designs with suitable door systems, glass, finishes and hardware.

  3. 03

    Confirm measurements and details

    We measure the opening and check swing, sill, access and the finishing included in the quote.

  4. 04

    Approve the order and timing

    Review the written scope before ordering. Product production or delivery time is confirmed separately from the installation schedule.

  5. 05

    Install and finish

    We protect the home, install and adjust the door, complete the agreed finishing and review the result with you. Time at your home depends on the scope.

Exterior-door FAQ

Exterior door questions

Practical answers about choosing, measuring, ordering and installing an exterior door.

What determines the installed cost of a replacement exterior door?

Size, glass, sidelights, transoms, hardware and finish affect the door price. Labour depends on the frame, access, sealing and agreed trim or repairs. A replacement in the existing opening is priced separately from opening construction. Your written quote identifies the product, installation, finishing, exclusions and applicable HST.

Does exterior door replacement include a new frame and disposal?

We measure, supply and install the selected door system. The written scope identifies the slab, frame, threshold, glass and hardware, plus removal and disposal of the old unit. Insulation, sealing and agreed trim work are planned together. Any retained components or additional wall repairs are identified before the order is approved.

Should I choose a steel or fibreglass entry door?

Start with the finish you want. Steel offers a smooth painted appearance; fibreglass options include smooth and wood-grain surfaces. Compare the complete quoted systems, including glass, frame and hardware. We’ll review suitable choices for your entrance and explain their price and care requirements.

How long does an exterior-door project take?

Timing includes the site measure, design approval, product ordering and work at your home. Supplier production varies with the selected system, glass and colour. Opening changes or hidden damage can add work. We confirm the expected production wait and installation schedule separately before the order is approved.

Does door installation include casing, brickmould and painting?

The quote defines the agreed finish on both sides of the entrance. It identifies casing, jamb extensions, exterior trim or brickmould, caulking and any capping, wall repair or painting included. These details vary with the opening. Review the listed inclusions and exclusions before approving the work.

How should I compare decorative and privacy door glass?

Compare daylight, the view through the glass and privacy with light behind it. Frosted, textured and decorative appearances do not by themselves establish a privacy or performance rating. Review the full pattern and the supplier’s glass information for your selected door system before approving the order.

Can my chosen hardware or smart lock be used?

Send the exact lockset or smart-lock model before ordering. Compatibility depends on the door preparation, backset, thickness and locking system; conventional and multipoint locks are not interchangeable by default. We check preparation and clearances with the selected door. Separately supplied hardware must include the required fitting parts.

Will a new door always fix a draft at the entrance?

The work needs to address the source of the draft. Air can enter through weatherstripping, poor alignment, frame joints or the frame-to-wall connection. A new slab alone may leave a perimeter problem. We review the door’s operation and surrounding conditions so the proposed installation addresses the identified cause.

Can my entrance have sidelights or a transom?

Yes, where the measured opening, structure and selected system allow. Sidelights add glazing beside the door; a transom adds glazing above it. Changing their size or arrangement can affect casing, exterior finishes and the opening itself. We assess those changes before confirming the design and ordering dimensions.

Do you handle sliding and other patio doors?

Yes, as part of exterior-opening work. The assessment includes operation, glass, threshold, surrounding water management and interior trim. A sliding panel that operates poorly may need different work from a failed glass unit or a damaged frame. The proposed scope should explain whether the complete system, selected components or the opening itself needs attention.

Can an existing window become an exterior door?

Yes, we can assess a window-to-door conversion. We check the wall, structure, services and exterior landing before defining the work and any required approvals. Our Aurora project converted a bedroom window into a glazed door onto the pool deck, with the surrounding opening and finishes completed together.

Which entrance photographs help with an initial door review?

Send the full entrance from outside, the frame and trim inside, a close view of the threshold and a wider view of the steps, landing or porch. Include damage, drafts or operation problems and the configuration you want. These views help identify related work, but they do not replace the final measure required before ordering.

What does Strataline’s lifetime workmanship warranty cover?

We warrant our labour and installation to the original client for as long as that client owns the property, subject to the applicable manufacturer-warranty period for supplied products. Where no meaningful manufacturer warranty exists, workmanship coverage continues through the original client’s ownership. If a problem is caused by our workmanship, we return and correct it. Coverage ends when the property is sold or another contractor modifies or repairs the covered work.

The warranty covers genuine labour or installation defects. It excludes ordinary dirt, normal wear, accidental damage, misuse, inadequate maintenance, unrelated water intrusion, structural movement and client-supplied product defects.

Who handles a warranty claim for a product Strataline supplied?

For a potential manufacturing defect within the applicable warranty period, we inspect the issue, document the condition, gather photographs and evidence, communicate with the supplier or manufacturer, and coordinate the claim for you. Strataline covers removal and reinstallation labour associated with a valid supplied-product warranty issue.

The replacement product is governed by the manufacturer’s written warranty; approval is not guaranteed. If a claim is denied because we installed the product incorrectly, we correct our work.

Vaughan, Toronto & the GTA

Get a quote for your door

Tell us about your entrance. Save a few favourites or ask us to help you choose.

Your design shortlist (up to 3)

Not sure yet? You can request help without choosing a design.

    Step 1 of 2

    Your entrance

    Attach photos or files (optional)

    Add up to 5 photos or documents. Photos are resized automatically.

    File requirements

    JPG, PNG, WebP, HEIC/HEIF, PDF or DOCX. Original photos: up to 25 MB each. PDF/DOCX: up to 3.5 MB combined, sent unchanged. Prepared files share 3.5 MB of sending space. The complete enquiry must fit within 4 MB. Original photos stay unchanged.

      Step 2 of 2

      How can we reach you?

      Provide a phone number or email address.

      We use your details and private attachments to respond to your enquiry. Privacy policy

      Prefer to talk? Call (416) 471-5999 or send a text.

      Your door enquiry

      Get a quote for your door

      Send your city, a few entrance photos if available, and the design you like. We’ll review the options with you and arrange the measurements needed for a written quote.

      Your design shortlist (up to 3)

      Not sure yet? You can request help without choosing a design.

        Step 1 of 2

        Your entrance

        Attach photos or files (optional)

        Add up to 5 photos or documents. Photos are resized automatically.

        File requirements

        JPG, PNG, WebP, HEIC/HEIF, PDF or DOCX. Original photos: up to 25 MB each. PDF/DOCX: up to 3.5 MB combined, sent unchanged. Prepared files share 3.5 MB of sending space. The complete enquiry must fit within 4 MB. Original photos stay unchanged.

          Step 2 of 2

          How can we reach you?

          Provide a phone number or email address.

          We use your details and private attachments to respond to your enquiry. Privacy policy

          Prefer to talk? Call (416) 471-5999 or send a text.