Modern flush profile
Offset glass in a strong colour
- Glass
- Offset vertical glass
- Finish
- Danube blue
- Layout
- Single door
Exterior door sales & installation · Vaughan, Toronto & the GTA
Choose from steel, fibreglass, glass and sidelite entry systems. Strataline coordinates the site measure, product order, installation, insulation, trim and finishing as one clear scope.
Owner-led • Product and installation in one scope • Clean finish inside and out
Start with the opening
Choose the closest direction. The product can be narrowed after the entrance, exposure and surrounding finishes are reviewed.
Start with the architecture, colour direction and amount of glass you want at the entrance.
Explore this direction
Review single- and double-sidelite layouts when the opening and proportions allow.
Explore this direction
Compare glass scale, pattern and privacy before the final door is ordered.
Explore this direction
Treat operation, glass, threshold, exterior sealing and interior trim as one scope.
Explore this directionStyle inspiration
Use these supplier and manufacturer references to identify proportions, glass, finish and configuration. A site measure and current product review come before any order.
Showing 12 of 24 door ideas.
Modern flush profile
Modern flush profile
Contemporary
Traditional panel
Craftsman
Craftsman
Contemporary panel
Traditional
Contemporary
Traditional panel
Traditional
Panelled
Full-lite
Linear contemporary
Two-panel
Traditional
Raised panel
Contemporary
Contemporary
Traditional
Contemporary
Transitional
Contemporary
Contemporary
Door-system and product images on this page are owner-provided supplier or manufacturer references for design discussion. They are not presented as Strataline project photography.
Photo-first consultation
Send one wide exterior photo, one interior photo, the threshold and any visible damage. That is enough to discuss the likely configuration, glass direction and questions the site measure needs to resolve.
Steel or fibreglass
Material is one decision among the slab construction, frame, glass, finish, hardware, seals, warranty and exposure at your entrance.
A crisp painted finish, broad style choice and a practical entry-door system.
Wood-look texture, dimensional stability and a wide range of finish directions.
Glass and panel direction
These are visual references, not promises of exact current availability. The final selection is confirmed against the chosen supplier system.
Compare pattern scale and privacy with the door viewed as a complete entrance.
A slimmer glass element can add daylight while keeping more of the slab solid.
Horizontal divisions give a full-height glass insert a more architectural rhythm.
A panel-led design keeps the door visually substantial without adding glass.
Sidelites can repeat the finish and proportions of the selected door system.
Large glass areas suit entrances where daylight and a lighter visual expression lead.
Configuration
Exact field dimensions determine whether the existing layout stays, changes or requires a broader opening-construction review.
A focused entrance within the existing rough opening.
Added glass or visual width on one side.
A balanced entrance with glass on both sides.
A broad opening planned around swing, hardware and symmetry.
Daylight above the slab where opening height permits.
A complete glazed surround requiring exact field dimensions.
Product + installation
A clear proposal distinguishes included work from assumptions. It also makes product comparisons more useful because the installation and finishing are not hidden outside the door price.
If concealed damage or an opening condition changes the scope after removal, it is documented and discussed before extra work proceeds.
Installation quality
The frame, sill, perimeter, hardware and connected finishes determine whether the installed system operates and looks complete.
The frame is set to operate consistently, not forced to follow a distorted opening.
The threshold, exterior perimeter and exposed joints are detailed for the actual entrance.
The gap between frame and structure is treated as part of the installation.
Interior and exterior finish relationships are discussed before the old unit is removed.
Swing, latch, deadbolt, seals and clearances are reviewed with the homeowner.
Patio and sliding doors
Patio and garden-door work is coordinated around operation, glass, threshold, sealing, trim and the relationship to the room and exterior landing.
A large glass area makes the threshold, drainage path and surrounding finish work especially visible.
Finish direction, panel rhythm and hardware should be considered as part of the room.
Swing space, active panel, screen strategy and exterior landing all affect the right configuration.
Casing, drywall, flooring and the sill transition determine whether the replacement looks complete.
Verified Strataline project · Aurora
This project documents Strataline’s opening and finish work. The supplier catalogue imagery elsewhere on this page is labelled separately and is used only for product inspiration.
View the complete Aurora projectDoor-system and product images on this page are owner-provided supplier or manufacturer references for design discussion. They are not presented as Strataline project photography.
Related client experience
These verified reviews speak to Strataline’s workmanship and occupied-home standards. Only one specifically mentions work on doors.
Google review
Related Strataline workmanship
This is the second time Max has done some work at our home. The first time was to remove popcorn from our hallway ceilings. We were so very impressed with the results and it was truly dust-free. This time Max removed wallpaper and prepared those walls for painting. He painted several other areas as well and sanded and reapplied urethane on all our new doors. And again it was dust-free! He and Galina are superb craftsmen. Their attention to the smallest of details speaks volumes of the pride they take in their work. A quality that is difficult to find these days. We highly recommend Strataline. Thank you Max and Galina. We will be calling again for the next project. Ilene and Mario, Maple
Google review
Related Strataline workmanship
We had great experience working with Max. He was very attentive to all our concerns and requests, easy communication and quality of workmanship is outstanding! Special care was taken to keep our living area clean and dust free as renovations were taking place. We’re very pleased with end result and will definitely recommend him!
From reference to installed door
Share the entrance from inside and outside, plus a photo from farther back for proportion.
Discuss style, material, glass, configuration, operation and the finish work around the opening.
Confirm field dimensions, swing, handing, sill conditions, trim and installation access.
Approve the written product and installation scope before the custom unit is ordered.
Protect the home, complete the included finishing, test operation and review care details.
Exterior-door FAQ
The visible answers and FAQ structured data use the same source.
Yes. The intended scope is a measured, supplied and installed door system with the included insulation, sealing, trim and finishing stated in writing.
The right choice depends on the look, glass layout, exposure, finish direction, product construction and budget. Strataline compares the shortlisted systems instead of treating one material as universally better.
Send the full entrance from outside, the frame and trim from inside, the threshold, and a wider view showing steps, landing, porch or nearby walls.
Photos are useful for the first review, but a custom order requires a site measure and confirmation of the opening, swing, handing and surrounding conditions.
Yes. Glass families can be shortlisted by appearance, daylight and privacy. Final availability and specifications are confirmed against the selected supplier system.
Sometimes. The existing opening width, structure, exterior finish, interior trim and desired proportions must be reviewed before changing the configuration.
A transom may be possible where the opening height and surrounding construction allow it. Exact sizing is confirmed during the measure and product review.
Yes. Many projects retain the opening location while replacing the complete prehung system and coordinating the perimeter and trim.
That becomes an opening-construction project, not a simple door replacement. Structure, services, exterior water management, approvals and finish transitions may all affect the scope.
It can be. The quote states which jamb extensions, casing, exterior trim, capping, caulking and paint-ready or finished surfaces are included.
Unexpected deterioration is photographed and discussed before work outside the written scope proceeds.
Hardware can be coordinated with the selected slab, multipoint or conventional preparation, backset, finish and smart-lock requirements. Compatibility is confirmed before ordering.
Yes, as a supporting exterior-opening service. Operation, glass, threshold, perimeter sealing and interior trim are reviewed together.
Ordering lead time varies by manufacturer and configuration. Installation timing depends on the opening and included finishing; both are discussed before the order is placed.
Strataline serves Vaughan, Toronto and surrounding GTA communities, subject to project scope and scheduling.
Start with the entrance you have
Include the property location, the look you prefer and anything you want changed about glass, colour, swing or configuration.