HERITAGE & INSTITUTIONAL PROJECT · STAIRCASE RESTORATION · TORONTO
150+ Year-Old Heritage Staircase Restoration for York General Hospital
York General Hospital was converting a Toronto heritage building more than 150 years old for modern medical use. We restored its two connected staircases rather than replacing them, preserving original wood, repairing damaged treads and integrating a complementary railing system.
- Client
- York General Hospital
- Location
- Toronto, Ontario
- Property
- Hospital-owned Toronto heritage building more than 150 years old
- Building use
- Conversion for modern medical use
- Staircase scope
- Two connected staircases from basement to second floor
- Preservation
- Original treads and posts, plus several original spindles, retained where practical
- Tread repairs
- Horizontal dowel stabilization and custom red-oak inserts
- Sanding system
- Festool ROTEX 150 with Festool dust extractors
- Railing
- Complementary new system installed with stainless-steel brackets
- PLANNING A HERITAGE RESTORATION?
Project overview
Restoring two staircases for modern medical use
York General Hospital was converting a Toronto heritage building more than 150 years old for medical use. We restored its two connected staircases, from the basement to the second floor.
Preservation before replacement
Preserving before replacing
We kept original treads, posts and several surviving spindles. Damaged wood needed repair, and later additions had to be removed before the staircases could be refinished.
Basement to second floor
One staircase system across three levels
The work followed the stairs from the narrow basement flight to the upper landing. Treads, risers, railing and adjoining walls needed attention at each level.
Original tread condition
Revealing the original wood
Carpet glue, paint, plaster and old finish covered the treads. Removing those layers exposed the wood and showed which areas needed repair.
Festool dust-controlled sanding
Dust-controlled sanding with the ROTEX 150
We used a Festool ROTEX 150 connected to dust extraction to remove the old coatings and glue.
Progressive surface restoration
Restoring the surface in stages
As the coatings came off, we checked each tread for cracks and damage. The amount of residue varied across the stairs, so some areas needed more sanding before repair.
Cracked original tread repairs
Stabilizing cracked original treads
We drove dowels horizontally through cracked treads at intervals to stabilize the wood. The ends were cut flush before further sanding and finishing.
Later alterations and custom wood repair
Repairing openings left by later spindle platforms
Removing later spindle platforms left square openings in the original treads. We fitted thin red-oak inserts into the openings, following the surrounding grain and setting the repairs flush with the surface.
Original and new railing components
Combining preserved and new railing components
Original posts and several spindles remained in the railing. We restored usable handrail pieces and fitted new sections where the railing was incomplete.
New railing integration
Completing the railing with stainless-steel brackets
Stainless-steel brackets secure the new railing sections beside the restored posts and treads.
Surrounding interior work
Finishing the rooms around the stairs
We repaired drywall and trim and painted the risers, stringers and surrounding woodwork. The main-floor window trim was repaired and painted, with the curved radiator kept beneath it.
Before and after · basement flight
Restoring the narrow basement flight
The narrow basement flight kept its original shape. Dark treads now sit between painted risers and walls, with handrails along the approach.
Before and after · main staircase
Restoring the main staircase
The restored main flight retains its old posts and several original spindles. Repaired treads and new railing sections fill the gaps left by damage and later alterations.
Finished heritage interior
Historic character retained
Original wood remains throughout the finished staircases, including the repaired treads. The replacement railing and freshly painted surfaces complete the work around those retained pieces.
Landings and railing details
Connecting the landings and railing details
At the landings, the new railing meets the existing posts, window and exposed brick. The curved stair base remains visible below.
RESTORATION DETAILS
From worn surfaces to a completed heritage staircase
CONTINUE EXPLORING
Related projects, guidance and services.
Stair refinishing and railing replacement
How We Refinished an Etobicoke Staircase and Replaced the Railing
An Etobicoke staircase refinished with dark treads and landings, white risers and stringers, and a new railing with square posts and balusters.
Connected ceiling, hardwood flooring, staircase and painting renovation
Coordinating Smooth Ceilings, Hardwood Floors and a Curved Staircase
See how Strataline coordinated popcorn ceiling removal, smooth ceiling finishing, hardwood installation and a complete stair transformation under one dust-controlled renovation.
Commercial LVT flooring installation for a childcare facility
3,000 Sq. Ft. Kindergarten Flooring Completed in 24 Hours
See how Strataline completed about 3,000 sq. ft. of LVT flooring in an Oakville kindergarten over one weekend, working overnight with zero downtime.
Should You Refinish Stairs or Install Hardwood Tread Caps?
Learn when existing hardwood stairs can be refinished and when carpeted or damaged stairs are better suited to hardwood tread caps.
Planning a heritage or institutional staircase restoration?
Strataline repairs historic wood, integrates complementary railing systems and coordinates surrounding finishes for difficult existing-condition projects across Toronto and the Greater Toronto Area.